Case Studies & Projects

Temporary Climate Solutions

Bill Gates Foundation World Headquarters - Iris Campus

With very little space in the yard and no space on the curbs outside to place equipment, logistical creativity was a must for the two large Iris Campus buildings of the Bill Gates Foundation World Headquarters.

Temporary Climate Solutions

Helix Water tank coating in dangerous summer heat

A four-million-gallon Helix Water District water storage tank was scheduled to have an old coating of lead-based paint removed from its roof and support structure. The advent of summer also threatened to cause dangerously high temperatures inside the tank, creating worker safety concerns.

Document Recovery Solutions

Hurricane Harvey Rapid Response

In late Summer of 2017, Hurricane Harvey made landfall in the Gulf of Mexico region of Texas and Louisiana. In addition to the 100+ lives lost, the Category 4 hurricane triggered unprecedented flooding that inundated hundreds of thousands of homes, commercial and government buildings in Southeast Texas and surrounding areas.

Temporary Climate Solutions

Temperature control for Yale Beineke Library

During a major renovation, the Beinecke Rare Book & Manuscript Library at Yale University was left without its permanent HVAC system, putting one of the world’s most significant collections of rare books and manuscripts at risk. The library houses priceless materials, including Gutenberg Bibles, early maps, and centuries old texts stored in a central glass tower and extensive underground stacks.

Temporary Climate Solutions

School construction in hot summer months

While deadlines and project details may always seem tight, none seem tighter than those concerning school construction projects. Schools must follow environmental regulations during renovations and new construction to keep students and faculty safe from potential health risks. New masonry construction began at MacArthur Elementary School in New York during the summer, including the gymnasium, library, and three two-story classroom wings. With construction costs near $80,000,000, interior conditions must be maintained during construction to meet design specifications and stay on schedule.